How to Set a Stone Walk or
Patio:
Tool and Material Checklist:
Flagstone, Mortar mix, Sand, Forming materials, Baby
sledge hammer, Cold chisel, Brick chisel, Tape measure,
Gloves, Safety glasses, Level, Broom, Brick trowel,
Concrete joint tool
Flagstone is a natural material so it looks good in almost
any setting. Flagstone is especially suited to garden
patios and walkways in a rustic atmosphere. The material's
highly irregular shape and color are an advantage here
where visual texture is desired. However, flagstone
doesn't mix well with other materials mainly because of
its irregular shape.
When combined with more geometric materials, such as
bricks, its distinctive irregular quality is reduced and
cheapened. As a material, flagstone is cut or flagged by
separating the layers or stratifications of rock
formations. The primary rocks used for this are limestone,
slate, bluestone and sandstone.
The quality and color of these stones vary and these
variances often become a retail pricing factor. The
hardness of the stones is important when choosing them for
certain projects. Slate generally is the hardest of the
flags and it is non-porous.
Color ranges are green, gray and purple. Limestone varies
both in hardness, from dense to granular; color is widely
varied: you can find lots of tones. Bluestone and
sandstone range in color from a light beige to pink to red
to a dark bluish tone. Both stones are fairly soft (as
compared to slate) and are easy to cut.
Measurements and Materials
Most retailers sell flags by the square foot. And many
retailers let you pick out what you want from the pile.
Therefore, you ought to know approximately how many square
feet of the material you'll need for your project, plus
about 10 percent for sizing and shaping and waste. You
will fracture some stone the wrong way. If possible, try
to prefit the flags as you select them.
Lay each piece down on the ground and try to match the
pieces as they would go together. You'll be a bit sloppy
doing this; the idea is to approximate matches so you'll
have less cutting to do later. The project you are
creating with flags will also determine other materials.
If you will set the flags on bare ground (in warm,
non-freezing climate), the thickness of the stones should
be a tad more than if you will set the stones on a sand
base. If the stones go on a concrete base, they can be
thinner because the concrete will support the thinner size
reducing breakage from weight on the stones' surface.
It is next to impossible to figure the amount of cement
and sand needed for setting flags, so we'll five you a
rule of thumb: buy 160 pounds of Portland cement and 525
pounds of mortar sand for every 50 sq. ft. of flagstone
surface. This formula will be just about right, although
you may be a little short or long, a problem easily
corrected as the job progresses.
Form Building
It is recommended that you build a light, easily
disassembled form for the flags, although you can get by
with a chalkline. The forms give the project an outline in
which to work and if you are laying the stones on sand or
concrete, the forms help contain this material as it is
being used.
When the job is complete, the forms can be easily
stripped. Or, you may want to leave the forms in position
for decorative purposes. Straight 2x4s are plenty big
enough; you could even use 1x4s if you will strip the
forms later. Working with stone is hot and heavy work. Be
very careful lifting this material: it weighs a lot, even
small pieces. Also, wear gloves and safety glasses when
cutting the stone to size. Stone chips can fly fast and
hard from hammers and chisels.
Flags Over Bare Ground
If you are laying flagstone over bare ground, here are the
working procedures in sequence:
1. Flagstone should be laid only on bare ground that isn't
subjected to freezing and thawing. The soil should be
well-drained. The flagstone you use for this installation
should be at least 2 in. thick, thicker if possible. We
recommend bare ground installation for walkways; we do not
recommend it for patios/porches.
2. Excavate the area to be paved slightly less than the
thickness of the flags. Since thickness varies, determine
the thickest stone and excavate to this thickness. The
thinner flags can be shimmed to bit by compacting earth
underneath them. This is easier than trying to dig out
special areas for thicker stones.
3. Lay out the stones in a 3x3 ft. area at on time and try
to match them to fit, like a jigsaw puzzle. Mark each
stone that doesn't fit to your liking for cutting.
4. Remove just one stone at a time for cutting and
shaping. Test it for fit as you go. When the fit is right,
remove another stone and go through the same process; then
move on to another 3x3 ft. area.
5. Joints between stones can be any width you want; a
pleasing space is between 1/2 and 3/4-inch. The joint
width, of course, will vary and this is okay. Just try to
make the joints fairly uniform.
6. As you complete one area, level it with a carpenter's
level. Even though the surface of the stones may be
slightly off level, the area should be in the level range,
and tipped slightly toward one edge for drainage purposes.
7. As you complete on area and move to the next, stand
back and look at the overall job to make sure you like the
pattern. If not, make any adjustments at this time.
8. Complete the job by filling the joints with soil. It is
suggested that you plant a hardy grass in this soil or use
a creeper type plating that will withstand a goodly amount
of foot traffic. The growth can be controlled with a
lawnmower as you regularly cut the grass.
Flagstone on Sand
If you are laying flagstone over a sand base, here are the
working procedures in sequence:
1. Excavate as necessary. Depth must include the
measurements of a 2-inch thick sand base and the thickness
of the flagstones that go over the base.
2. It is recommended that forms be used to keep the sand
confined. Set these as you would a concrete form and make
a notched dragboard to level the sand.
3. Spread the sand evenly. Then, lightly sprinkle the
surface of the sand with water. use the fine spray setting
on the hose nozzle. Let the sand absorb the water and then
sprinkle the surface once again. This helps compact the
sand even though you will rough it somewhat when laying
the stones.
4. Lay out the stones in a small area at one time and try
to match them to fit like a puzzle. Keep straight edges
along the straight form edges. Mark each stone for fit,
lift it out of the pattern, and cut it accordingly. If
you're cutting off fairly large pieces of stone, save the
pieces; you may need them for filler later.
5. Reposition the stone in the sand, and, with a rubber or
wooden hammer, tap the stone down into the sand so about
one half its thickness is buried in the sand.
6. After a small area of stone has been set, level it with
a carpenter's level. It should be at approximate level and
pitched slightly toward an edge for drainage. To level the
stones, add sand to stones that are low or tippy, and
remove sand from those that are high.
7. After the setting is complete, spread sand evenly over
the project and sweep the sand into the joints until the
joints are full. Sprinkle the joints with fine spray from
a garden hose. Let the sand dry. Sprinkle again and again
until the joints are hard and compacted.
Flags Over Concrete
If you are laying flagstone over a concrete base, here are
the working procedures in sequence:
1. The stones should be about 1/2 to 1-inch in thickness,
no more than 1-inch is required because of the support
provided by the concrete. Lay out the stones on the
concrete surface in a small area and match, mark, and cut
to size, leaving from 1/2 to 3/4-inch, between units.
2. In a mixing tub, stir up a batch of concrete. A good
formula is 1 part cement to 4 parts sand with enough clean
water added to make a stiff concrete mixture.
3. A good way to tell a stiff mixture is to ball a small
amount of concrete in a gloved hand. The mix should form
and retain a ball, like a snowball. In a mixing tub, stir
up a batch of what masons call concrete butter. This
mixture is plain cement mixed with water to the
consistency of soft butter. Not runny, but extremely soft.
You should be able to hold a slice of it on a trowel. Fill
a bucket with water, and have a GI scrub brush or whisk
broom handy.
4. Lift a couple of fitted flagstones from the concrete
base. Then wet this area with water, spreading the water
with the brush or broom.
5. With a bricklayer's trowel, spread a 1-inch or so thick
layer of concrete. Immediately reset the stones in the
concrete, tapping them in place and level with the handle
of the trowel. The stones should be embedded about half
their thickness in concrete. After you have set several
stones, level them. The stones should, however, pitch just
a tad for drainage.
6. Carefully lift each stone that has been set. With a
trowel; spread out the cement butter over the concrete,
sort of like buttering a piece of bread. You don't need
much butter, a couple of ounces is usually plenty. The
trick is not disturbing the concrete base into which the
stone has been fitted. You may want to pour out the butter
from a tin can and then trowel it.
7. Replace each stone after buttering it and tap it
lightly into place with the handle of the trowel. Check
the stones again for level and make any adjustment.
8. When a fairly large area of stones are in place, go
back to the joints between the stones and remove the
concrete in the joints. Use a pointed trowel for this; a
tuckpointing trowel makes an excellent tool and it is
inexpensive to buy. The joint when you finish should be
the depth (thickness) of the stone. The bottom of the
joint should match the bottom surface of the stone.
9. With a brush or whisk broom and a sponge and water, go
over the face of each flag, removing concrete splatters.
10. Let the concrete set 36 hours.
11. Sweep the stones with a broom.
12. Mix up a batch of concrete grout. A good formula for
grout is 1 part cement to 1 part fine, clean sand. Add
enough water to make a stiff mixture. Better it is on the
stiff side than the thin side.
13. With a bricklayer's trowel, fill the joints, a small
area at a time, with the grout mixture. Pack it in as
tight as you can, keeping the excess off the face of the
stones at the joint line.
14. After you fill the joints in a fairly small area,
strike the joints with a concave jointing tool, the kind
mason's use to smooth joints in brick and block.
15. When you're finished, remove any excess grout from the
face of the stones. Let the grout set for 36 hours.
Sprinkle it lightly with water, keeping it moist during
this time. You can now walk on the surface. However, it is
recommended that you let the job set about 1 week before
you walk on it. Keep the grout moist with water from a
sprinkler during this period. This makes the grout much
more durable. |